03 декабря 2011 15:08

Scheme of Almaty subway

ПОДЕЛИТЬСЯ

Tengrinews.kz stock photo Tengrinews.kz stock photo

The first stage of the first line of Almaty subway includes seven stations, Tengrinews.kz reports. The first station, Raiymbek, is located at the crossing of Raiymbek and Furmanov streets. The next stop, Zhibek Zholy, is at the crossing of Gogol and Panfilov streets. The third station is located at the crossing of Kabanbai batyr and Panfilov streets and is called Almaly. Abay station is on Abay street. The fifth station called Baikonyr is located at the crossing of Abay and Baitursynov streets. According to the scheme, the distance between these two stations is the longest in the acting line. The sixth station ib on Mukanov street. The station is called Auezov Theater. The final station Alatau is located at Gagarin street. The operating line of Almaty subway is marked in red. The cost of the operating part of the subway is 166 billion tenge ($1.1 billion). The line is 8.56 km long. Its average depth is 40 meters. Mobile communications will not be available in Almaty subway. The cost of the trip is 80 tenge ($0.54). The residents will be able to use smart-cards that can be charged for 5 to 90 trips, as well as single-use slugs. The trains will cruise with an interval of 20 minutes during normal hours and every 9 minutes during rush hours. Subway opened on December 1 and Kazakhstan President Nursultan Nazarbayev became its first passenger.


The first stage of the first line of Almaty subway includes seven stations, Tengrinews.kz reports. The first station, Raiymbek, is located at the crossing of Raiymbek and Furmanov streets. The next stop, Zhibek Zholy, is at the crossing of Gogol and Panfilov streets. The third station is located at the crossing of Kabanbai batyr and Panfilov streets and is called Almaly. Abay station is on Abay street. The fifth station called Baikonyr is located at the crossing of Abay and Baitursynov streets. According to the scheme, the distance between these two stations is the longest in the acting line. The sixth station ib on Mukanov street. The station is called Auezov Theater. The final station Alatau is located at Gagarin street. The operating line of Almaty subway is marked in red. The cost of the operating part of the subway is 166 billion tenge ($1.1 billion). The line is 8.56 km long. Its average depth is 40 meters. Mobile communications will not be available in Almaty subway. The cost of the trip is 80 tenge ($0.54). The residents will be able to use smart-cards that can be charged for 5 to 90 trips, as well as single-use slugs. The trains will cruise with an interval of 20 minutes during normal hours and every 9 minutes during rush hours. Subway opened on December 1 and Kazakhstan President Nursultan Nazarbayev became its first passenger.
Читайте также
Join Telegram

Exchange Rates

 446.44   490.7   4.77 

 

Weather

 

Редакция Advertising
Социальные сети