1. Main
  2. Learn
  3. News overview
  4. Kazakhstan

Pavlodar oil refinery reintroduced into operation following overhaul

A total of 2.1 million tons of crude were processed in the H1 2011, 300 000 tons down as compared to the like period of 2010: refinery Vice Director General Evgenyi Dvurekov.

O&G equipment. ©RIA Novosti