Water level in Lake Balkhash risesTengrinews.kz - The Ministry of Water Resources and Irrigation of Kazakhstan reported that 13.5 billion cubic meters of water have been directed
Launch of Balkhash thermal power plant might be postponedWe expected the power plant to be launched in 2018. However, with modernization of the already operating power plants and a decrease in consumption, the actual demand for the Balkhash power plant capabilities will be seen around 2022: Vice Minister of Energy.
Turan tiger population to be restored The Ussuri tigers are going to be brought to Kazakhstan in a step to restore the Turan tiger population in 2014-2015.