04 October 2011 | 13:30

Kazakhstan was late to start modernizing its oil refineries: Minister of Oil and Gas Sauat Mynbayev

ПОДЕЛИТЬСЯ

Oil and Gas Minister Mynbayev. vesti.kz stock photo Oil and Gas Minister Mynbayev. vesti.kz stock photo

Kazakhstan was behind the schedule to overhaul its oil refineries. Timely expansion of the capacities could neutralize price fluctuations and fuel shortages in the domestic market, Minister of Oil and Gas Sauat Mynbayev stated when speaking at the VI KAZENERGY international forum in Astana October 4, Novosti Kazakhstan reports. The Minister reminded that at the moment there are three oil refineries operating in Kazakhstan: in Atyrau, Shymkent and Pavlodar. According to him, “overhaul of the three refineries will enable to raise processing to 17.5 million tons, introducing deeper conversion to start producing petrol in line with Euro-5 emission standards”. “After 2019-2020 plans are there to construct another refinery”, Mynbayev said. Mid-July Tengrinews.kz reported, citing PM Karim Massimov, that a special survey had been made and it had shown that it was more feasible for Kazakhstan to upgrade three existing plants, rather than construct a new one. Construction of the fourth plant would cost the country $6 billion, while reconstruction of existing refineries will cost $2.5-3 billion. Massimov said that modernization of existing plants would finish not later than on January 1, 2015. It was reported earlier that since the start of the year petrol price had grown by 17.4%, with prices set by oil refineries growing by 23%. Retail prices for diesel fuel have grown by 20% since the start of the year. Besides, Tengrinews.kz reported that In January – July 2011 petrol production in Kazakhstan had dropped 16% as compared to the like period of 2010. According to the stats, production figure for the period made up 1.5 million tons, 15.9% down against the same period of 2010.


Иконка комментария блок соц сети
Kazakhstan was behind the schedule to overhaul its oil refineries. Timely expansion of the capacities could neutralize price fluctuations and fuel shortages in the domestic market, Minister of Oil and Gas Sauat Mynbayev stated when speaking at the VI KAZENERGY international forum in Astana October 4, Novosti Kazakhstan reports. The Minister reminded that at the moment there are three oil refineries operating in Kazakhstan: in Atyrau, Shymkent and Pavlodar. According to him, “overhaul of the three refineries will enable to raise processing to 17.5 million tons, introducing deeper conversion to start producing petrol in line with Euro-5 emission standards”. “After 2019-2020 plans are there to construct another refinery”, Mynbayev said. Mid-July Tengrinews.kz reported, citing PM Karim Massimov, that a special survey had been made and it had shown that it was more feasible for Kazakhstan to upgrade three existing plants, rather than construct a new one. Construction of the fourth plant would cost the country $6 billion, while reconstruction of existing refineries will cost $2.5-3 billion. Massimov said that modernization of existing plants would finish not later than on January 1, 2015. It was reported earlier that since the start of the year petrol price had grown by 17.4%, with prices set by oil refineries growing by 23%. Retail prices for diesel fuel have grown by 20% since the start of the year. Besides, Tengrinews.kz reported that In January – July 2011 petrol production in Kazakhstan had dropped 16% as compared to the like period of 2010. According to the stats, production figure for the period made up 1.5 million tons, 15.9% down against the same period of 2010.
Читайте также
Join Telegram
Dollar rose by 3 tenge in Kazakhstan
The most trendy gifts for 2024 Holidays
Strike in Zhanaozen: New details emerge
Volcanic eruption has begun in Iceland
Bitcoin reaches all-time high again
Sirens sounded across Kazakhstan
Kazhydromet warns Almaty and Shymkent
Kazakhstanis advised to leave Ukraine
Sirens to sound throughout Kazakhstan
COVID-19 may shrink cancer tumors
Earthquake struck Kyrgyzstan overnight
Лого TengriSport мобильная Лого TengriLife мобильная Иконка меню мобильная
Иконка закрытия мобильного меню

Exchange Rates

 498.68   522.66   4.79 

 

Weather

 

Редакция Advertising
Социальные сети