03 December 2011 | 15:08

Scheme of Almaty subway

ПОДЕЛИТЬСЯ

Tengrinews.kz stock photo Tengrinews.kz stock photo

The first stage of the first line of Almaty subway includes seven stations, Tengrinews.kz reports. The first station, Raiymbek, is located at the crossing of Raiymbek and Furmanov streets. The next stop, Zhibek Zholy, is at the crossing of Gogol and Panfilov streets. The third station is located at the crossing of Kabanbai batyr and Panfilov streets and is called Almaly. Abay station is on Abay street. The fifth station called Baikonyr is located at the crossing of Abay and Baitursynov streets. According to the scheme, the distance between these two stations is the longest in the acting line. The sixth station ib on Mukanov street. The station is called Auezov Theater. The final station Alatau is located at Gagarin street. The operating line of Almaty subway is marked in red. The cost of the operating part of the subway is 166 billion tenge ($1.1 billion). The line is 8.56 km long. Its average depth is 40 meters. Mobile communications will not be available in Almaty subway. The cost of the trip is 80 tenge ($0.54). The residents will be able to use smart-cards that can be charged for 5 to 90 trips, as well as single-use slugs. The trains will cruise with an interval of 20 minutes during normal hours and every 9 minutes during rush hours. Subway opened on December 1 and Kazakhstan President Nursultan Nazarbayev became its first passenger.


Иконка комментария блок соц сети
The first stage of the first line of Almaty subway includes seven stations, Tengrinews.kz reports. The first station, Raiymbek, is located at the crossing of Raiymbek and Furmanov streets. The next stop, Zhibek Zholy, is at the crossing of Gogol and Panfilov streets. The third station is located at the crossing of Kabanbai batyr and Panfilov streets and is called Almaly. Abay station is on Abay street. The fifth station called Baikonyr is located at the crossing of Abay and Baitursynov streets. According to the scheme, the distance between these two stations is the longest in the acting line. The sixth station ib on Mukanov street. The station is called Auezov Theater. The final station Alatau is located at Gagarin street. The operating line of Almaty subway is marked in red. The cost of the operating part of the subway is 166 billion tenge ($1.1 billion). The line is 8.56 km long. Its average depth is 40 meters. Mobile communications will not be available in Almaty subway. The cost of the trip is 80 tenge ($0.54). The residents will be able to use smart-cards that can be charged for 5 to 90 trips, as well as single-use slugs. The trains will cruise with an interval of 20 minutes during normal hours and every 9 minutes during rush hours. Subway opened on December 1 and Kazakhstan President Nursultan Nazarbayev became its first passenger.
Читайте также
Join Telegram
Countries you shouldn't go to in 2025
Elon Musk broke his own world record
Storm warnings issued across Kazakhstan
Dollar rose by 3 tenge in Kazakhstan
The most trendy gifts for 2024 Holidays
Strike in Zhanaozen: New details emerge
Volcanic eruption has begun in Iceland
Bitcoin reaches all-time high again
Sirens sounded across Kazakhstan
Лого TengriSport мобильная Лого TengriLife мобильная Иконка меню мобильная
Иконка закрытия мобильного меню

Exchange Rates

 498.58   523.88   4.74 

 

Weather

 

Редакция Advertising
Социальные сети