05 October 2011 | 16:41

Part of West Europe-West China road to open by the end of 2011

viewings icon comments icon

ПОДЕЛИТЬСЯ

whatsapp button telegram button facebook button
Minister of Transport and Communications Berik Kamaliyev. Photo courtesy of flickr.com Minister of Transport and Communications Berik Kamaliyev. Photo courtesy of flickr.com

750km part of the international highway “West Europe-West China” is scheduled to be launched by the end of 2011, KazTAG reports citing Kazakhstan Minister of Transport and Communications Berik Kamaliyev. “We are working on the road of 1,815 km at the territory of 4 oblasts,” the Minister said. According to him, the Ministry is planning to reconstruct the total of 2,415 km of the road. “Concrete works are performed from the border with China to Turkestan and asphalt-concrete works from Turkestan to the border with Russia,” Kamaliyev said. 35 thousand people and 6 thousand vehicles are involved in the construction effort. The total length of “West Europe – West China” motor corridor at the territory of Kazakhstan is 2,787 km. The road will cross 5 oblasts. The total cost of the project is 825 billion tenge ($5.6 billion).

whatsapp button telegram button facebook button copyLink button
Иконка комментария блок соц сети
750km part of the international highway “West Europe-West China” is scheduled to be launched by the end of 2011, KazTAG reports citing Kazakhstan Minister of Transport and Communications Berik Kamaliyev. “We are working on the road of 1,815 km at the territory of 4 oblasts,” the Minister said. According to him, the Ministry is planning to reconstruct the total of 2,415 km of the road. “Concrete works are performed from the border with China to Turkestan and asphalt-concrete works from Turkestan to the border with Russia,” Kamaliyev said. 35 thousand people and 6 thousand vehicles are involved in the construction effort. The total length of “West Europe – West China” motor corridor at the territory of Kazakhstan is 2,787 km. The road will cross 5 oblasts. The total cost of the project is 825 billion tenge ($5.6 billion).
Читайте также
Join Telegram Последние новости
Earthquake occurred in the Caspian Sea
ChatGPT has experienced a global outage
Mass fish kill recorded in Atyrau
Лого TengriNews мобильная Лого TengriLife мобильная Лого TengriSport мобильная Лого TengriAuto мобильная Иконка меню мобильная
Иконка закрытия мобильного меню
Открыть TengriNews Открыть TengriLife Открыть TengriSport Открыть TengriAuto Открыть TengriTravel Открыть TengriEdu Открыть TengriGuide

Exchange Rates

 525.1  course up  547.74  course up  4.84  course up

 

Weather

 

Редакция Advertising
Социальные сети
Иконка Instagram footer Иконка Telegram footer Иконка Vkontakte footer Иконка Facebook footer Иконка Twitter footer Иконка Youtube footer Иконка TikTok footer Иконка WhatsApp footer