05 October 2011 | 16:41

Part of West Europe-West China road to open by the end of 2011

viewings icon comments icon

ПОДЕЛИТЬСЯ

whatsapp button telegram button facebook button
Minister of Transport and Communications Berik Kamaliyev. Photo courtesy of flickr.com Minister of Transport and Communications Berik Kamaliyev. Photo courtesy of flickr.com

750km part of the international highway “West Europe-West China” is scheduled to be launched by the end of 2011, KazTAG reports citing Kazakhstan Minister of Transport and Communications Berik Kamaliyev. “We are working on the road of 1,815 km at the territory of 4 oblasts,” the Minister said. According to him, the Ministry is planning to reconstruct the total of 2,415 km of the road. “Concrete works are performed from the border with China to Turkestan and asphalt-concrete works from Turkestan to the border with Russia,” Kamaliyev said. 35 thousand people and 6 thousand vehicles are involved in the construction effort. The total length of “West Europe – West China” motor corridor at the territory of Kazakhstan is 2,787 km. The road will cross 5 oblasts. The total cost of the project is 825 billion tenge ($5.6 billion).

whatsapp button telegram button facebook button copyLink button
Иконка комментария блок соц сети
750km part of the international highway “West Europe-West China” is scheduled to be launched by the end of 2011, KazTAG reports citing Kazakhstan Minister of Transport and Communications Berik Kamaliyev. “We are working on the road of 1,815 km at the territory of 4 oblasts,” the Minister said. According to him, the Ministry is planning to reconstruct the total of 2,415 km of the road. “Concrete works are performed from the border with China to Turkestan and asphalt-concrete works from Turkestan to the border with Russia,” Kamaliyev said. 35 thousand people and 6 thousand vehicles are involved in the construction effort. The total length of “West Europe – West China” motor corridor at the territory of Kazakhstan is 2,787 km. The road will cross 5 oblasts. The total cost of the project is 825 billion tenge ($5.6 billion).
Читайте также
Join Telegram Последние новости
The Moon is calling: New lunar mission
Wolf attacked man in Atyrau region
Euronews office opened in Astana
Earthquake recorded in Zhambyl region
Tokayev sent telegram to Qatar’s Emir
A New Year gift guide for her
Tokayev expressed condolences to Macron
Bitcoin exchange rate hit a new record
EU expanded sanctions against Belarus
Kazhydromet warned residents of Almaty
Лого TengriNews мобильная Лого TengriSport мобильная Лого TengriLife мобильная Лого TengriAuto мобильная Иконка меню мобильная
Иконка закрытия мобильного меню
Открыть TengriNews Открыть TengriLife Открыть TengriSport Открыть TengriTravel Открыть TengriGuide Открыть TengriEdu Открыть TengriAuto

Exchange Rates

 523.95  course up  543.16  course up  5.1  course up

 

Weather

 

Редакция Advertising
Социальные сети
Иконка Instagram footer Иконка Telegram footer Иконка Vkontakte footer Иконка Facebook footer Иконка Twitter footer Иконка Youtube footer Иконка TikTok footer Иконка WhatsApp footer