Kazakhstan launches construction of Astana-Almaty high-speed railway

ПОДЕЛИТЬСЯ

Kazakhstan launches construction of Astana-Almaty high-speed railway Photo courtesy of railways.kz

Construction of a high-speed Astana-Almaty railroad has started in Kazakhstan, Tengrinews.kz reports citing Kazakhstan Transport and Communications Minister Askar Zhumagaliyev. “Construction of the high-speed Astana-Almaty railroad has started this year,” Zhumagaliyev said in the Majilis (lower chamber of the parliament). This railroad line will decrease the traveling time between the two cities from 12 to 5 hours. The new route will be around 1,011 km long, 400km shorter than the existing one. Kazakhstan President Nazarbayev made an instruction to build this high-speed railroad branch in the beginning of 2013. He said that the line had to be constructed in 5-6 years. By Renat Tashkinbayev

ПОДЕЛИТЬСЯ
Construction of a high-speed Astana-Almaty railroad has started in Kazakhstan, Tengrinews.kz reports citing Kazakhstan Transport and Communications Minister Askar Zhumagaliyev. “Construction of the high-speed Astana-Almaty railroad has started this year,” Zhumagaliyev said in the Majilis (lower chamber of the parliament). This railroad line will decrease the traveling time between the two cities from 12 to 5 hours. The new route will be around 1,011 km long, 400km shorter than the existing one. Kazakhstan President Nazarbayev made an instruction to build this high-speed railroad branch in the beginning of 2013. He said that the line had to be constructed in 5-6 years. By Renat Tashkinbayev
Tengrinews
Читайте также
Join Telegram
Tokayev to visit Ashgabat
Almaty buried in snow
35-degree cold hits Kazakhstan
President of Iran to visit Kazakhstan

Exchange Rates

 518.81  course up  609.28  course up  6.55  course down

 

Weather

location-current
Алматы

 

Редакция Advertising
Социальные сети