20 December 2011 | 17:41

2 billion tenge required for restoration of Zhanaozen

ПОДЕЛИТЬСЯ

Photo by Maksim Popov© Photo by Maksim Popov©

2 billion tenge ($13.6 million) is required for restoration of all the facilities damaged in Zhanaozen clashes, Tengrinews.kz reports. After preliminary inspection of the facilities Vice Prime-Minister Umirzak Shukeyev reported to Prime-Minister at the government meeting. The total number of the damaged facilities is 41, including 5 administration buildings. “We have preliminarily calculated that around 770 million tenge ($5.2 million) is required for restoration of the town administration building. Over 1 billion tenge ($6.8 million) is needed for restoration of 3 KazMunaiGas facilities. 29 commercial facilities and bank buildings will require around 250 million tenge ($1.7 million) for restoration. Reconstruction of 2 residential buildings will cost over 3 million tenge ($20 thousand). In general preliminary calculation shows that the cost of damage of all the facilities may be 1.9 billion tenge,” Umirzak Shukeyev told Karim Massimov in a conference call into the government meeting in Astana. Construction companies will start restoring the buildings within a week. “We have agreed that the companies and the contractors will start the construction works at their own expense, without waiting for a decree on assignment of funds from the reserves,” Shukeyev said. Their expenses will be reimbursed later. On December 19 Kazakhstan Prime-Minister Karim Massimov signed the decree On creation of the government commission for urgent resolution of social-economic, humanitarian and other issues arising from clashes in Zhanaozen. The government commission is made of 17 people, including Akim (Governor) of Mangistau oblast, minister and representatives of national companies.


Иконка комментария блок соц сети
2 billion tenge ($13.6 million) is required for restoration of all the facilities damaged in Zhanaozen clashes, Tengrinews.kz reports. After preliminary inspection of the facilities Vice Prime-Minister Umirzak Shukeyev reported to Prime-Minister at the government meeting. The total number of the damaged facilities is 41, including 5 administration buildings. “We have preliminarily calculated that around 770 million tenge ($5.2 million) is required for restoration of the town administration building. Over 1 billion tenge ($6.8 million) is needed for restoration of 3 KazMunaiGas facilities. 29 commercial facilities and bank buildings will require around 250 million tenge ($1.7 million) for restoration. Reconstruction of 2 residential buildings will cost over 3 million tenge ($20 thousand). In general preliminary calculation shows that the cost of damage of all the facilities may be 1.9 billion tenge,” Umirzak Shukeyev told Karim Massimov in a conference call into the government meeting in Astana. Construction companies will start restoring the buildings within a week. “We have agreed that the companies and the contractors will start the construction works at their own expense, without waiting for a decree on assignment of funds from the reserves,” Shukeyev said. Their expenses will be reimbursed later. On December 19 Kazakhstan Prime-Minister Karim Massimov signed the decree On creation of the government commission for urgent resolution of social-economic, humanitarian and other issues arising from clashes in Zhanaozen. The government commission is made of 17 people, including Akim (Governor) of Mangistau oblast, minister and representatives of national companies.
Читайте также
Join Telegram
Swans were born in Almaty Zoo
Kazakhstani man extradited from Turkey
NSC conducted arrest in Almaty
The dollar has fallen in Kazakhstan
8 new bus routes launched in Almaty
Kassym-Jomart Tokayev arrived in Baku
Лого TengriSport мобильная Лого TengriLife мобильная Иконка меню мобильная
Иконка закрытия мобильного меню

Exchange Rates

 496.01   523.53   4.96 

 

Weather

 

Редакция Advertising
Социальные сети